WLD Nadcap Audit Criteria

Common Nonconformances Found During an WLD Audit

Content

Compliance to the weld schedule - This is a compliance requirement located in paragraphs 11, 12 and 13 of the weld process checklists. The Auditee must demonstrate that the parameters/setting and weld tasks specified in the procedure are being done in accordance with the approved document.

Content

When Auditees receive NCRs, they are closed using a through root cause and corrective action process that ensures the issue does not recur. 

Content

Insufficient purchasing controls - No documented procedures that define the specification and certification requirements including receiving inspection verification responsibilities for welding consumables such as filler material or gas. These requirements are located in the fusion weld and brazing checklists, AC7110/5 and AC7110/1 in multiple sections. The intent is to ensure consumable requirements are correctly defined thereby ensuring Customer specifications are met. Auditees are often found to have no systematic control over purchasing and receiving and rely on employees to know what is needed.