SE Nadcap Audit Criteria

Common Nonconformances Found During an SE Audit

Content

AC7117, 6.4.2 Is media shape inspected in accordance with the specified method and recorded at the required intervals of run time?

Content

AC7117, 2.6.5 Did the Auditee upload an active specification list to eAuditNet prior to the audit?

Content

AC7117/2, 9.6.17 Is nozzle or wheel position to the part listed on the technique sheet and correctly followed in production?

Content

AC7117/2, 9.6.14 Are all process monitoring equipment and/or gauges identified as to their calibration status and current?