Fluid Distribution Systems (FLU) play a critical role in aircraft operation by ensuring the reliable delivery of hydraulic fluids and fuel necessary for flight control, propulsion, and system actuation. The manufacture and processing of FLU components require strict adherence to approved procedures, inspection requirements, and customer specifications to maintain product integrity and airworthiness. Nonconformance Reports (NCRs) provide a structured method for identifying deviations from these requirements and serve as a key indicator of process e ectiveness and compliance within the quality management system.
This Top 10 NCR Paragraph Report summarizes the most frequently cited audit nonconformances identified between 01 May 2024 and 30 April 2025 across FLU part numbers and revisions, including AC7000 and the AC7126 family. The data, compiled through CMSP monitoring and Nadcap® audit activity, highlights recurring audit paragraphs related to process control, equipment monitoring, work instruction accuracy, and inspection execution. By analyzing NCR trends through both detailed tables and frequency charts, this report supports targeted corrective action, continuous improvement efforts, and ongoing compliance with the Nadcap® program requirements for Fluid Distribution Systems manufacturing.View our "How to Get Started" page and walk through the necessary steps you'll need to take and get resources or create an EAN account to request a quote.

What are FLU Industry Challenges?
- Fluid and pressure leakage
- Contamination control and cleanliness failures
- Installation and assembly errors
- Aircraft-on-ground (AOG) events
- Fire and safety risks associated with fluid systems

How a Nadcap FLU Accreditation Supports You
- Provides independent verification that fluid distribution system processes are capable of consistently meeting customer and technical requirements
- Reduces the risk of leaks, contamination, and system failures that can impact aircraft safety and reliability
- Improves process discipline across fabrication
FLU Nadcap Audit Criteria
AC7112 - Fluid Systems
AC7112/1 - Hose Manufacturing
AC7112/2 - Fittings and Other Machined Components
AC7112/3 - Couplings and Formed Sheet Metal Components
AC7112/4 - Hose Assembly
AC7112/6 - Titanium 3AI-2.5V Alloy, Seamless Hydraulic Tubing
AC7112/7 - Tube Fabricated Assemblies
AC7123 - Value Added Hose Assembly DistributorsThe PRI EANSM platform provides suppliers with a single place to view, understand, and navigate Nadcap Audit Criteria so you know exactly what will be assessed before, during, and after an audit. Create an EAN account to access the criteria and learn what you need to know to support your Nadcap accreditation.
Common Nonconformances Found During an FLU Audit
- Content
Inadequate control and maintenance of cutting fluids, including failure to follow documented procedures or customer requirements.
- Content
Insu cient calibration or monitoring of production and inspection equipment.
- Content
Use of unverified or unapproved process parameters, including speeds, feeds, and tool change limits.
- Content
Inadequate preventive maintenance execution or documentation.
- Content
Improper control or use of tooling, abrasives, or dressing tools.
